This work scope includes the construction of the project known as PIP-II Main Ring Crossing ISD/Engineering project number 4-3-6. PLEASE NOTE the important information related to this RFP: Pre-Proposal Meeting and Site Visit: June 2, 2026, 10:00a CDT
Energy, Department of Illinois366946_MRIndustrial Building Construction
Fermi Forward Discovery Group LLC (FFDG) requests a proposal for the Long-Baseline Neutrino Facility Deep Underground Neutrino Experiment (LBNF/DUNE-US) Concrete Project in accordance with this RFP and the enclosed Proposal Preparation Instructions and other e
Energy, Department of Lead, South DakotaRFP-LBNF-381525-ROIndustrial Building Construction
As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form wher
Energy, Department of Lead, South Dakota73573Industrial Building Construction
Ames Laboratory, under a prime contract with the U.S. Department of Energy (DOE), has a requirement for concrete construction services. With this Request for Proposal (RFP), you are invited to furnish a fixed-price proposal for this requirement. All work is to
Energy, Department of Ames, IowaRFP-26-699Highway, Street, and Bridge Const…