Loading…
Place of performance
—
Response deadline
Sep 15, 2025, 03:00 PM
The Contractor shall erect 40 feet of stair scaffolding from the bottom of the dewatered lock chamber floor to the top of the temporary dam. The approximate location for this scaffolding will be 10 to 15 feet upstream of the lower miter gates on the land wall side of the chamber. The scaffolding can be anchored to the vertical concrete lock wall from the bottom of the chamber floor to the top of the 40-foot scaffolding. The Contractor shall provide 5 each 1-inch-thick steel …
Read the full solicitation
Start free to unlock the complete notice, the contracting officer’s contact details, and every solicitation document.
Aaron Barr
Activity in our index
16 opportunities · avg award $14M (1) · last active Oct 26, 2026.
Miriaha D. Sigmon
Activity in our index
25 opportunities · avg award $360k (3) · last active Aug 07, 2026.
Draft an outreach email with AI
A tailored, professional email to the contracting officer about this solicitation — written in seconds, grounded in this notice.
Free with an account · included with a WinAContract account. AI-written, grounded in this notice — review before sending.
Send it to GovCon — docs + AI brief, automatically.
We pull the solicitation files and summarize what you need to know.